













| Category | Item | Detail |
|---|---|---|
| Profile | L*W*H | 6055*2435*2896 (Internal 5845*2225*2520) |
| Parameter | Floor Live Load | 2.0KN/㎡ |
| Frame | Corner Column | Galvanized plate, t=3.0mm, steel profile SGH340 |
| Roof Decoration | Insulation | Glass wool, density≥14kg/m³ |
| Floor Decoration | Surface | Rubber flooring sheet, marble white color |
| Wall Panel | Thickness | 75mm thickness sandwich panel |
| Electrics | Voltage | 220V~240V, 50HZ |
Quick install mobile toilets and cheap container houses.



Packaging Details: Container house flat packing.
Delivery Time: 30 days.
Normally, the delivery time is: Prefab house: 20-25 days, Container house: 15-20 days, Steel structure: 25-30 days, Villa: 30-35 days.
We have large production capacity: Prefab house: 100,000m², Container house: 400 units, Steel structure: 2000 tons, Villa: 100,000m².
Prefab house: 50m², Container house: 3 units, Steel structure: 200m², Villa: 100m².
We accept Wire transfer or LC.
We have been awarded certificates by CE, American building Code, ISO9001, ISO14001, OHSAS18001 and China Classification Society.
Yes, we have 80 experienced supervisors who could go to guide the installation at any time, and we also offer turn-key project installation teams.